
Service area / Monument
General Contractor in Monument, Colorado
Monument sits almost exactly on the line where the regional snow load jumps, and a permit here passes through two offices. Both shape a Tri-Lakes project long before the framing crew arrives.
- Sheet
- SA-02
- County
- El Paso County
- Local factors
- Permits: Town and PPRBD
- Elevation: about 6,982 ft
- Town business license
We are a general contractor in Monument, Colorado, building custom homes, additions and remodels for owners in the Tri-Lakes area. The town sits at the base of the Rampart Range on the southern slope of the Palmer Divide, bordered by Pike National Forest to the west and Colorado Springs and the U.S. Air Force Academy to the south. That position puts Monument close to a structural threshold, inside a regional permit system and on top of a watershed divide, and each of those changes how we plan a project here.
Two offices handle a Monument permit
Monument uses the Pikes Peak Regional Building Department (PPRBD), the same office that reviews work in Colorado Springs and unincorporated El Paso County. The Town adopted the Pikes Peak Regional Building Code by Ordinance 05-2023, passed April 17, 2023, and the current second printing took effect June 30, 2026. It adopts the 2021 International Building and Residential Codes, the 2021 energy code and the 2023 National Electrical Code.
The Town does not hand everything to PPRBD, though. Its Planning Department handles permits for new builds, alterations and demolition alongside the regional office, applications go through the Town's Community Connect portal, and the Town says its own review can take three to five business days from acceptance. Before any of that, the contractor needs an active Town of Monument business license.
| Criterion | Town of Monument | PPRBD |
|---|---|---|
| Permits | Planning review for new builds, alterations and demolition | Building plan review, permits and inspections |
| Before you apply | Active Town business license for the contractor | Contractor registration and licensing |
| Site | Fences, tree removal, right of way, land development | Floodplain development permits |
| Money | Use tax on construction materials | Permit and plan review fees |
The 7,000 foot line runs through town
PPRBD's design criteria set a ground snow load of 43 pounds per square foot below a 7,000 foot grade plane and 57 pounds per square foot at or above it, with a basic wind speed of 130 miles per hour and Exposure C. Monument's elevation is about 6,982 feet. In most towns that kind of threshold is an abstraction; here it can split a single subdivision.
Drainage on the Palmer Divide
The Palmer Divide separates the Arkansas and South Platte river basins, and Monument Creek runs from the Rampart Range through Palmer Lake and west Monument. PPRBD's Floodplain Management Office issues Floodplain Development Permits for the Town, and the Town published a 2026 Stormwater Master Plan and a 2026 Roadway and Pavement Design Criteria Manual among its permit resources. On sites near a drainage, grading and stormwater are part of the design conversation from the first site visit.
Below the surface, the Colorado Geological Survey maps potentially swelling soil and rock along the entire Front Range urban corridor and calls swelling clay one of the most costly geologic hazards in the state. El Paso County Public Health also notes that the county is designated as an area with high radon potential. We budget for the geotechnical report and talk through radon mitigation early on every new home.
Town rules that reach the job site
Some Monument requirements show up on site rather than at plan review. Construction materials are subject to Town use tax. Monument Municipal Code 8.20.050 limits construction to 7 a.m. to 7 p.m. on weekdays and 8 a.m. to 6 p.m. on Saturdays, with no work on Sundays or national holidays, and violations can bring a summons to the owner, developer, general contractor and subcontractors alike. The Town also publishes Landscape Guidelines and a Monument Fire District impact fee schedule.
Sequencing a Monument project
If The lot is near 7,000 feet
Then Confirm the grade plane before structural design and price the roof for the right snow load.
If The site borders Monument Creek or a mapped floodplain
Then Add a PPRBD Floodplain Development Permit to the schedule and design grading to the Town's stormwater plan.
If Trades will need weekend days to hold the schedule
Then Plan around the Saturday hours and the Sunday prohibition before committing to a finish date.
If The project includes fencing, tree removal or work in the right of way
Then Apply for the separate Town permits alongside the building permit.
What we build in Monument
Residential work dominates here. A PPRBD report to the Town Council, covered by Our Community News in March 2026, counted 152 residential construction permits in the Monument area in 2025, led by Jackson Creek, Home Place Ranch and Monument Junction. Our work in town follows that pattern: new residential construction, custom homes on Tri-Lakes lots and additions and renovations to existing houses. Each one starts with the same pre-construction review: jurisdiction, snow load zone, drainage and soils, priced before the drawings are final.
The bottom line
- Monument permits run through both the Town's Planning Department and PPRBD.
- A Town business license comes before the permit application.
- At about 6,982 feet, the survey decides whether the 43 or 57 psf snow load applies.
- Construction hours, use tax and drainage rules reach the job site as well as the drawings.
Monument on the map
Nearby, we also build in Colorado Springs, Castle Rock and Parker. See every Front Range service area, or request a consultation for a Monument project.
Building in Monument: common questions
Who issues building permits in Monument?
Building permits in Monument involve both the Town and the Pikes Peak Regional Building Department. The Town's Planning Department handles new builds, alterations and demolition permits alongside PPRBD, and the Town has adopted the Pikes Peak Regional Building Code.
Does a contractor need a Monument business license?
Yes. The Town requires contractors to hold an active Town of Monument business license before applying for a permit, so it is one of the first items we confirm on a Monument project.
What snow load applies to a house in Monument?
PPRBD sets a ground snow load of 43 pounds per square foot below a 7,000 foot grade plane and 57 pounds per square foot at or above it. Monument sits at about 6,982 feet, so the site survey decides which number the structure is designed for.
When can construction crews work in Monument?
Monument's municipal code allows construction from 7 a.m. to 7 p.m. Monday through Friday and 8 a.m. to 6 p.m. on Saturday, with no work on Sundays or national holidays. Homeowners doing their own work are exempt.
How long does Town permit review take?
The Town says its review can take three to five business days from acceptance. That is the Town's portion only; PPRBD plan review and any other approvals run on their own schedule.
Monument projects
Build here,build right.
Tell us where the Monument project is and what you have in mind. The local permit path and site conditions are the first things we look at.
Request a consultation






