
Service area / Westminster
General Contractor in Westminster
Westminster has three wind zones, a 30 business day first review for commercial permits and no deferred fire submittals. A project here holds its schedule when those are planned from the start.
- Sheet
- SA-14
- County
- Adams and Jefferson counties
- Local factors
- Permits: City via eTRAKiT
- Wind: 131, 142 or 155 mph
- Commercial review: 30 days
We work as a general contractor in Westminster, Colorado, on commercial buildings, tenant improvements, new homes and renovations. Westminster sits about 9 miles north-northwest of the State Capitol, spanning Adams County, where most residents live, and Jefferson County across 34 square miles, with I-25, US 36, US 287 and state highways 95, 121 and 128 running through it. Incorporated in 1911, it has a paperless permit system and firm review timelines, and both shape how we schedule a project here.
Codes and the 2026 electrical change
The City of Westminster Building Division, part of Community Services, handles permits entirely through eTRAKiT. The 2021 International Residential, Building, Plumbing, Mechanical, Fuel Gas, Fire, Energy Conservation, Existing Building and Swimming Pool and Spa Codes have been in effect since June 1, 2024, with city amendments in Municipal Code Title XI Chapter 9. Effective August 1, 2026, permits must comply with the 2026 National Electrical Code. The city's Design Criteria for Structures set a 30 psf ground snow load, a 36 inch frost depth, Seismic Design Category B and a 12 inch anticipated snow depth.
Three wind zones
Westminster has three wind speed zones, divided along Sheridan Boulevard and Wadsworth Parkway, and the city marks the area as a special wind region. The highest zone is on the west side, around Standley Lake.
| Criterion | Zone | Design wind speed |
|---|---|---|
| East | 131 mph | Lowest zone |
| Middle | 142 mph | Between the dividing corridors |
| West, around Standley Lake | 155 mph | Highest zone |
A 24 mph difference in design wind speed between the east and west sides of one city changes the structural connections, roof attachment and window specifications. We confirm the zone from the address before the engineer sizes anything, and we do not reuse a plan across zones without rechecking it.
Commercial review times and fire permits
Westminster lists 30 business days for the initial review of a commercial building permit and 15 business days for each subsequent review. A single round of corrections therefore adds three weeks, so complete, coordinated drawings save real time here. Fire suppression and fire alarm permits are no longer accepted as deferred submittals; they must be applied for separately through the fire department when the building permit is submitted.
Scheduling a Westminster project
If It is a commercial building or tenant improvement
Then Plan 30 business days for first review and submit fire permits at the same time.
If The site is west of Wadsworth near Standley Lake
Then Engineer for the 155 mph wind zone.
If It is new residential construction
Then Plan for the City's Lot Grade Survey Program.
If The house is older and historically significant
Then Look at state tax incentives available through Westminster's Certified Local Government status.
No new homes in a floodplain
Newer homes in Westminster are not allowed to be built in a floodplain, though older homes near waterways may sit inside one. The Mile High Flood District, Adams County, Arvada, Jefferson County and Westminster updated the Little Dry Creek flood hazard study, and Westminster holds a Class 5 rating in the NFIP Community Rating System, which brings a 25 percent flood insurance discount in certain areas. The Building Division also runs a Lot Grade Survey Program for residential new construction.
Weather and ground matter as much as water. The National Weather Service reports that storms on May 30, 2024 brought hail up to baseball size in northeast Denver and 1.5 to 2.25 inches elsewhere in the metro, with damage estimates likely exceeding $1 billion. The Colorado Geological Survey reports that expansive clays cause more property damage than any other natural hazard in the state. Roofing, siding and foundations are specified with both in mind.
What we build in Westminster
Westminster's commercial corridors and Downtown Westminster bring commercial construction and tenant work, and its neighborhoods bring new homes and additions. Its 2008 Historic Preservation Ordinance created the Historic Landmark Board, and as a Certified Local Government the city gives homeowners access to state tax incentives for work on older, historically significant homes. On larger jobs, project management keeps review rounds, inspections and submittals moving on the city's timelines.
The bottom line
- Westminster permits are paperless through eTRAKiT under the 2021 codes and the 2026 electrical code.
- Wind speeds are 131, 142 or 155 mph depending on the zone.
- Commercial permits take 30 business days for first review and 15 for each resubmittal.
- Fire suppression and alarm permits are submitted with the building permit, not deferred.
Westminster on the map
Nearby, we also build in Arvada, Broomfield, Thornton and Denver. See every Front Range service area, or request a consultation for a Westminster project.
Building in Westminster: common questions
Who issues building permits in Westminster?
The City of Westminster Building Division, part of Community Services, at 4800 W. 92nd Avenue. Permitting is fully paperless through the eTRAKiT portal.
Which codes apply in Westminster?
The 2021 International Codes have been in effect since June 1, 2024, with city amendments in Municipal Code Title XI Chapter 9. Effective August 1, 2026, permits must comply with the 2026 National Electrical Code.
How long does a commercial permit review take in Westminster?
The City lists 30 business days for the initial review of a commercial building permit and 15 business days for each subsequent review.
Can fire sprinkler and alarm permits be deferred in Westminster?
No. Fire suppression and fire alarm permits are no longer accepted as deferred submittals and must be applied for separately through the fire department at the time of the building permit application.
Can I build a new home in a Westminster floodplain?
No. Newer homes in Westminster are not allowed to be built in a floodplain, though older homes near waterways may sit inside one. Westminster holds a Class 5 rating in the NFIP Community Rating System, which brings a 25 percent flood insurance discount in certain areas.
Westminster projects
Build here,build right.
Tell us where the Westminster project is and what you have in mind. The local permit path and site conditions are the first things we look at.
Request a consultation







